Build Complete Projects at the Frontier

Hand over the drawings, the model and the specification, and get back a register sourced to the clause.

Book a demo
ArchieAssistant4 documents checked

Which Level 2 dampers still have no signed test record?

Level 2 dampers with no signed test record, with the room each one sits in and where its record stands.
DamperRoomTest record
MSD/L02/0207L02-0408 COMMS EQUIPMENT ROOMReady to witness
MSD/L02/0213L02-0410 LIFT LOBBY CIRCULATIONReady to witness
MSD/L02/0221L02-0414 MAINTENANCE STORENot installed
MSD/L02/0224L02-0416 MCC CONTROL ROOMReady to witness

MSD/L02/0221 is the one to chase first. It is not installed yet, so it holds up the RA-01 leakage test as well as its own drop test.

Sources

Hover a citation to mark the document it came from, or open the register to see every row.

Checked against the standards that govern the work

  • AS 4254.2
  • AS 1668.2
  • DW/143
  • DW/144
  • NCC
  • ISO 19650
  • IFC
  • AS/NZS 3500
  • AS/NZS 3000
  • AS 2118.1

One record, from tender to handover.

One evidence trail through every seat on the job: the number a subcontractor prices is the number a commissioner signs.

For subcontractors

Price the scope from the specification, measure the quantities from the model, hand over the records.

Explore Archie for subcontractors

For independent commissioners

Scan the overlay instead of auditing the spreadsheet, and sign a record that locks on signing.

Explore Archie for commissioners

Archie is not a tool your team uses. It is a member of your team.

Meet the Archie brain

The method

Archie never guesses the numbers.

Every quantity, allowable and test pressure is computed by a deterministic engine. The language model only reports what the engine computed.

Every discipline, one evidence trail.

The register.

Tag, type, size, system, room and level, with the basis and the source on every row.

See how it is built

Fire and smoke damper register

Asset register

One row per damper tag, matched to its room, its system and the thing that proved the room. A tag whose room cannot be proved is printed with the room withheld.

Tags on register

13

Room proved

12

From the model

6

Withheld

1

Room proved by
Damper register. Each row gives the tag, type, size, system, room, level and the basis the room was proved on, and opens to show where that room came from.
TagRoom
L02-0408 COMMS EQUIPMENT ROOMModel
L02-0410 LIFT LOBBY CIRCULATIONModel
L02-0412 RISER 2Printed mark
L02-0412 RISER 2Printed mark
L02-0416 MCC CONTROL ROOMDrawn symbol
L02-0414 MAINTENANCE STOREModel
L02-0416 MCC CONTROL ROOMModel
L03-0508 TENANCY OFFICE FLOOR EASTPrinted mark
L03-0512 TENANCY OFFICE FLOOR WESTPrinted mark
L03-0508 TENANCY OFFICE FLOOR EASTModel
L03-0512 TENANCY OFFICE FLOOR WESTModel
L03-0516 PLANT RISER 4Drawn symbol
WithheldWithheld

Showing all 13 tags. Open a row to see where its room came from.

Assets on plan.

Every roomed asset drawn on your own layout sheets, ringed where the position disagrees with the room.

See how it is built

Assets on plan

Level 02

14 of 14 drawn · 3 position flags

A crop of a mechanical layout drawing showing a supply duct run with grilles and dampers above and below a central plant enclosure, with every text label removed

Hover or focus an asset to read its tag, room and the basis its position came from. Every flag on this plate sits on a basis other than the model.

3 assets computed into a room other than the one assigned.

Plan linework is a de-identified crop with every text span removed. Tags, rooms and positions are invented for this page.

Drawing to schedule.

A symbol, a printed mark and a room solid go in, and one defensible schedule line comes out.

See how it is built

Leakage testing: what each document actually requires

5 documents, 5 columns. Cells are extractions with page citations, unverified until checked.

RIV-COMMISSIONING-PLAN-Rev-A.pdf

Duct classification
Not addressed
Test standard
AS 4254.2 referenced for leakage, AS 1668.1 for smoke controlp9verified“Leakage testing shall be carried out to AS 4254.2 and smoke control testing to AS 1668.1.”
Sample rate
Not addressed
Witness required
Independent commissioning agent to witness all hold pointsp11verified“All hold points shall be witnessed by the independent commissioning agent.”
Rectification
Not addressed

RIV-FIRE-DAMPER-SCHEDULE-Rev-A.pdf

Duct classification
Not addressed
Test standard
AS 1668.1:2015 damper drop testp1verified“Each damper shall be drop tested in accordance with AS 1668.1:2015.”
Sample rate
100% of dampersp1verified“One hundred per cent of installed dampers shall be drop tested.”
Witness required
Fire engineer to witness the first 10 dampersp2unverified“The fire engineer shall witness the first ten damper drop tests.”
Rectification
Not addressed

RIV-ITP-MECH-Rev-2.pdf

Duct classification
Class B, 500 Pap3verified“Ductwork is Class B and shall be tested at 500 Pa.”
Test standard
AS 4254.2:2012p3verified“Leakage testing to AS 4254.2:2012.”
Sample rate
10% by lengthp3verified“Ten per cent of each system by length shall be tested.”
Witness required
Hold point, Superintendent and Contractor QAp4verified“Hold point. Superintendent and Contractor QA to attend.”
Rectification
Raise NCR, re-test, close out before commissioningp4unverified“Raise a non-conformance report, re-test and close out before commissioning.”

RIV-MECH-SPEC-Rev-C.pdf

Duct classification
Class B to AS 4254.2, low pressure, 500 Pa maximump41verified“All low pressure ductwork shall be Class B to AS 4254.2 and shall not exceed 500 Pa.”
Test standard
AS 4254.2:2012 with DW/144 as the cross-checkp41verified“Leakage shall be assessed to AS 4254.2:2012, with DW/144 used as a cross-check.”
Sample rate
10% of installed length per system, minimum one test per systemp42verified“A minimum of 10 percent of the installed duct length of each system shall be tested.”
Witness required
Superintendent's representative, 5 business days noticep43unverified“The Superintendent's representative shall be given five business days notice of each test.”
Rectification
Seal, re-test the full system, not the failed section onlyp43unverified“Where a system fails, the full system shall be sealed and re-tested, not the failed section only.”

RIV-SUBCONTRACT-MECH-Rev-B.pdf

Duct classification
Adopts the specification by reference; no separate class statedp12verified“The Subcontractor adopts the specification classification by reference.”
Test standard
Not addressed
Sample rate
Priced at 10%, confirm against spec cl. 15.6.4p27unverified“Leakage testing is priced at ten per cent of installed length.”
Witness required
Not addressed
Rectification
Re-test at Subcontractor's cost, no extension of timep28verified“Re-testing after a failure is at the Subcontractor's cost and carries no extension of time.”

Take-off.

Quantities computed from the model by explicit rules, with the area basis named.

See how it is built

Ductwork take-off

Measured quantities

Criteria version riv-2026-09-a

Systems

7

Run length

629.2m

Element area

1,399.0m²

Spread between bases

80.4m²

Area basis

Every duct element is measured once. A crossover section that two systems both draw through is held against one of them only, so the total is the fabric that exists. This is the basis for a quantity.

Reading now: Element area, 1,399.0 m² across 7 systems. The other basis reads 1,479.4 m². The two are never added together.

SA Supply air

3 systems

Supply air systems with run length and surface area on the element area basis
RefLen mElement m²
SA-01L02-0402 AHU PLANT ROOM118.4268.2
SA-02L02-0410 LIFT LOBBY CIRCULATION74.9171.0
SA-03L03-0508 TENANCY OFFICE FLOOR EAST141.2322.6
SA total334.5761.8

RA Return air

2 systems

Return air systems with run length and surface area on the element area basis
RefLen mElement m²
RA-01L02-0414 MAINTENANCE STORE96.7214.9
RA-02L03-0512 TENANCY OFFICE FLOOR WEST88.1196.4
RA total184.8411.3

TA Toilet exhaust

2 systems

Toilet exhaust systems with run length and surface area on the element area basis
RefLen mElement m²
TA-31L02-0421 SANITARY CORE NORTH52.3108.7
TA-32L03-0519 SANITARY CORE SOUTH57.6117.2
TA total109.9225.9

Illustrative figures. System refs, room codes and fan families are invented for this page.

Commissioning documents.

The governing requirement is chosen by the standards hierarchy, and the tier is named. Where two conflict, the more onerous governs.

See how it is built

ITR Pack · Ductwork Leakage (ITR-MEC-014)

ITR pack

SA-01 · L02-0402 AHU PLANT ROOM · Rev B

Pre-test checks

0 of 6 complete

Test pressure

Sealing class

Class B, the specified class for this system. The two standards land close together and the tighter one governs.

Test particulars

Test pressure

500Pa

Design flow

4,200L/s

Design ESP

500Pa

Duct length

118.4m

Duct area

268.2m²

Min test length

11.8m

10 per cent of the run

AS allowable

210L/s

268.2 m² × 0.783

DW allowable

166.28L/s

268.2 m² × 0.620

Governing allowable (DW/144)

166.28L/s

The lower of the two, at 500 Pa, class B

Crossover area

21.5m²

Mandatory test

Yes

Result

Result withheld. 6 pre-test checks outstanding, so this record carries no verdict yet.

Sign-off

Performed by
Reviewed by
Accepted by

Illustrative figures. The pack number, system ref, room code and leakage factors are invented for this page.

Scope gaps.

Specification, drawings and the priced bill are read as three independent sources. Anything missing from one is raised as a gap.

See how it is built

Scope gap reconciliation

Scope gap register

The specification, the drawing set and the priced bill are read separately, then compared. A system that is not in all three is a gap, and a gap is worth money or a fire engineering consequence.

Systems read

12

In all three

8

Gaps

4

Show

RA-02not found in the priced bill

EA-02not found in the drawings

EA-03not found in the specification

SX-02not found in the priced bill

Specification
cl. 15.2.1
Drawings
RIV-MECH-DUCT-0001
Priced bill
Item 4.01
Specification
cl. 15.2.1
Drawings
RIV-MECH-DUCT-0002
Priced bill
Item 4.02
Specification
cl. 15.2.2
Drawings
RIV-MECH-DUCT-0006
Priced bill
Item 4.03
Specification
cl. 15.3.1
Drawings
RIV-MECH-DUCT-0003
Priced bill
Item 4.04
Specification
cl. 15.3.1
Drawings
RIV-MECH-DUCT-0007
Priced bill
Not found
Specification
cl. 15.4.1
Drawings
RIV-MECH-DUCT-0004
Priced bill
Item 4.06
Specification
cl. 15.4.2
Drawings
Not found
Priced bill
Item 4.07
Specification
Not found
Drawings
RIV-MECH-DUCT-0008
Priced bill
Item 4.08
Specification
cl. 16.1
Drawings
RIV-MECH-DUCT-0002
Priced bill
Item 4.09
Specification
cl. 16.1
Drawings
RIV-MECH-DUCT-0007
Priced bill
Not found
Specification
cl. 15.5
Drawings
RIV-MECH-DUCT-0003
Priced bill
Item 4.11
Specification
cl. 15.7
Drawings
RIV-MECH-DUCT-0006
Priced bill
Item 4.12

Showing all 12 systems. 4 of them are gaps.

A site compound at the end of the day, lengths of galvanised ductwork and steel strut stacked on timber bearers beside the containers, with workers walking away toward the site buildings in low sun
Illustrative photography, not from any client project. Archie has been field-tested on a live rail station project, with nothing retained afterwards.
What the assistant returnsSynthetic example

Which Level 2 dampers still have no signed test record?

Four, each shown with the room it serves and the record still outstanding.

Damper registerRIV-MECH-SPEC cl. 16.2AS 1668.1:2015

What is the allowable leakage on supply air system SA-02-01?

Computed from the sealed duct area, with the governing standard and its tier named.

Duct take-off, run 214AS 4254.2DW/143

Which rooms on Level 3 have no fire damper drawn?

Three, each traced to the specification section and the page that calls for one.

Room scheduleSheet M-3102RIV-MECH-SPEC s.23 31 00

See the output, not a promise.

Assets on plan, ringed where the position disagrees with the room.

See how it is built

The ITR pack, with the governing allowable on the face of it.

See how it is built

Photographs of the running product on a demonstration project. Every surface in them is live and interactive on the platform page.

Numbers that carry their own working.

Tagged assets registered on a live rail station project

2,459

Of those assets placed in a room

96%

Held-out rooms correct on room number

89 of 103

Numbers written by a language model

0

Built for documents you cannot leak.

Put your security requirements in front of us and we will walk you through how Archie meets them, control by control.

Our security posture

Per-project isolation

Details

Never used to train models

Details

Encrypted in transit and at rest

Details

Signed means sealed

Details

Everything leaves a trail

Details

Role-gated access

Details